PERFORMANCE ANNUAL REPORT

Facility/System Name: City of New Bern

Responsible Entity: City of New Bern

Person in Charge/Contact: Jordan B. Hughes, P.E., City Engineer

Applicable Permit(s): WQCS00052

Description of Collection System or Treatment Process:
Wastewater treatment uses physical, biological and chemical processes to remove pollutants from water so it can safely be returned to the environment.

Performance
The Wastewater Treatment Plant treated approximately 1.46 billion gallons of wastewater in 2010. The monthly average flow was 121.67 million gallons and the daily average was 4.01 million gallons. The peak flow of 13.86 million gallons per day was recorded on October 1, 2010. The plant was compliant for all monitoring permit requirements for the twelve months. The annual removal rate was greater than 99.1 % for oxygen demanding pollutants or 1538 tons for the year. The average biological oxygen demand for the effluent was less than 2.3 parts per million. The annual removal rate was greater than 98.7 % for total suspended solids or 1184 tons for the year. The average annual total suspended solids for the effluent was less than 2.52 part per million. Approximately 1037 million gallons were discharged to the river. The annual loading of the river for total nitrogen was 60,991 pounds. Approximately 354 million gallons or 24.2% of the annual treated wastewater went to a quarry for reuse. This reduced the nutrient loading to the river, however, the City has not received nitrogen credits for reuse. Approximately 20.6 million gallons of sludge were pressed in 2010. It was pasteurized by Quicklime and heat to a Class A residual. It is used for fertilizer for farmland and home gardens.

III Discharges of Untreated Wastewater:

For the year 2010, the City of New Bern had a total of 26 Reportable Wastewater Spills with a yearly total of 776,624 gallons of untreated wastewater reaching surface waters.  The high volume of wastewater reaching the surface waters was due mostly to a tropical storm rain event.

This information is required by North Carolina General Statues Article 21 Chapter 143.215.C.  For additional information, please contact Jordan Hughes, P.E., City Engineer at 252-639-7526.

CITY OF NEW BERN
REPORTABLE SEWER SPILLS 2010
  ADDRESS GALLONS
JANUARY
01/13/2010
3821 Martin Drive 0
01/18/2010
514 W. Thurman Road 0
01/19/2010 120 Taberna Way 400
01/23/2010
  1719 Green Park Terrace   480
01/25/2010
  Intersection Ave. B & N. Pasteur Street   5
   
FEBRUARY
02/08/2010
1726 Green Park Terrace 105
02/11/2010 1816 Edenton Street 15
02/23/2010 3400 Belmont Blvd. 819
   
MARCH
03/26/2010 120 Taberna Way 3298
         
APRIL
04/01/2010
514 W. Thurman Road 1840
     
MAY
05/20/2010
3105 MLK, Jr. Blvd. 1
05/21/2010
100 Colonel Burgwyn Dr. 9
         
JUNE
06/08/2010 1707 Hwy 70 East   0
06/22/2010   1707 Hwy 70 East   0
   
JULY
07/07/2010 107 Brody Lane   350
   
AUGUST
08/13/2010 1602 Hwy 70 East 48
   
SEPT.
09/03/2010 120 Kenmore Court 300
09/30/2010 801 S. Glenburnie Road 764,640
   
OCTOBER
10/01/2010 1610 Racetrack Road. 400
10/01/2010 4003 Reunion Point 2700
10/04/2010 147 Grantham Place 5
10/06/2010 2210 Henderson Ave. 54
10/17/2010 104 Nature Court   870
   
NOVEMBER
11/09/2010 4022 Old Cherry Point Road 150
11/16/2010 214 Station House Road 35
   
DECEMBER
12/24/2010 102 Kenmore Court 100
   
TOTAL VOLUME 776,624
TOTAL NUMBER OF SPILLS 26

 

The total amount of untreated wastewater reaching surface waters in 2010 was 776,624 gallons

This information is required by North Carolina General Statutes Article 21 Chapter 143.215.C. For additional information, please contact Jordan Hughes, P.E. City Engineer at 252-639-7526.